Roto-Phase Application Guide

ApplicationUnit Required
Air Conditioning Roto-Phase II - FLA of compressor needed
Aircraft Power Pack Roto-Phase I - Input Amps needed
Auger - Dry or Wet Roto -Phase I - Dry or Roto-Phase II - Wet
Bagging Equipment Roto-Phase I - Check for 3 phase Heating Elements
Band Saw Roto-Phase I
Battery Charger Roto-Phase I - Input Amps needed
Blender Roto-Phase II - FLA needed
Blower (Exhaust) Roto-Phase I
Blower (Organ) Roto-Phase I - Compare FLA with HP
Blower (Pneumatic) Roto-Phase I - Compare FLA with HP
Buffer Roto-Phase I
Car Wash Equipment Roto-Phase I
Center pivot Equipment PV Series - Need HP of each tower motor & quantity
Centrifugal Pump Roto-Phase I - Closed discharge, Roto-Phase II Open discharge
CNC Design CNC Design - Size to spindle HP
CNC Router CNC Series - Need Spindle HP
Compressor (A/C Unit) Roto-Phase II - FLA of compressors needed, compare to HP
Compressor (Air) Roto-Phase I - Rotary Screw or Piston or Roto-Phase II if starting with Head Pressure
Compressor (Refrigeration) Roto-Phase II - FLA of compressors needed, compare to HP
Computer COMP Design - KVA of computer needed (Watch for "Y" system requirements)
Convection Oven Roto-Phase I - need KW of heating elements or reconnect for single phase
Conveyor Roto-Phase I - starts with no load, Roto-Phase II starts with load
Cut off Saw Roto-Phase I
Cutter/Mixer Roto-Phase II - Need FLA of mixer motor
Dishwasher Roto-Phase I - Check for 3 phase Heating Elements
Door Opener Roto-Phase I - for light doors, Roto-Phase II for heavy doors
Drill Press Roto-Phase III or possible Static Converter
Dry-cleaning Machine Roto-Phase I - need FLA of refrigeration compressor
Dryer (Clothes) Roto-Phase I
Dust Collector Roto-Phase I
Edger Bander Roto-Phase I
EDM CNC Series - Need Input Amps to Machine
Electric Fryer Roto-Phase I - Need KW of heating elements
Elevator (Manlift) Roto-Phase II
Elevator (Passenger) CHDELV Series - Size to HP
Fire Siren Roto-Phase I - need FLA of Siren motor, oversize to handle any motor problems.
Flood Gate Roto-Phase II
Flywheel Load Roto-Phase II
Fraction HP Motors Roto-Phase I
Gang Rip Saw Roto-Phase I
Garbage Disposal Roto-Phase II
Gear Head Motor Roto-Phase I
Grinder Motor Roto-Phase I
Hammermill Roto-Phase II
Heating Elements Roto-Phase I - need KW or amperage
Hoist (Electric) HDH Series Roto-Phase
Hoist (Hydraulic) Roto-Phase II
Hydraulic Press Roto-Phase I - started without pressure, Roto-Phase II started with pressure
Ice Cream Machine Roto-Phase II - need FLA of compressors and augers
Ice Maker Roto-Phase II - need FLA of compressors and augers
Iron Worker Roto-Phase II
Irrigation (Center Pivot) PV Series - Need HP of each tower motor & quantity
Irrigation (Pump) Roto-Phase I - for closed discharge, Roto-Phase II for open discharge
Jointer Roto-Phase II
Lathe (Standard Roto-Phase I - possible Static Converter
Machine Tool Equipment Roto-Phase I - check FLA of spindle motor, Roto-Phase II if imported, CNC Design for CNC equipment
Meat Grinder Roto-Phase I - started without meat in grinder, Roto-Phase II - started with meat
Meat Saw Roto-Phase I
Metal Saw Roto-Phase I
Metal Shear Roto-Phase II - Flywheel or hydraulic motor
Motor Generator Welder Roto-Phase I - FLA of motor needed
Oil Jack Pump Roto-Phase II
Panel Saw Roto-Phase I
Paper Baler Roto-Phase II
Paper Cutter Roto-Phase II - Hydraulic motor started with pressure
Planer Roto-Phase I - or Roto-Phase II if imported planer
Press Brake Roto-Phase I hydraulic motor started without pressure, Roto-Phase II started with pressure
Printing Press Roto-Phase II - for jogging go up one size
Punch Press Roto-Phase II - Hydraulic motor started with pressure
Radar Equipment TM Series - KW required
Radial Arm Saw Roto-Phase I
Radio Transmitter TM Series - KW required
Rectifier Transformer Welder Roto-Phase I - Need Input amps
Router Roto-Phase I
Sewage Lift Stations Automatic Series - Check Conditions
Sewing Machines Roto-Phase I
Sewing Machines CNC Design CNC Series
Shaper Roto-Phase I
Ski Lifts Roto-Phase II
Stone Saw Roto-Phase I
Submersible Pump SP Series
Swimming Pool Pump Roto-Phase III or possible Static Converter
Table Saw Roto-Phase I
Trash Compactor Roto-Phase II
Turbine Pump Roto-Phase I
Valve Motor Roto-Phase I
Vertical Hollow Shaft Pump Roto-Phase I
Washing Machine Roto-Phase I
Wheel balancer Roto-Phase I - if the machine has an electronic brake, Roto-Phase II for instant reverse of motor.
Wide Belt Sander Roto-Phase I - if Timesaver Design use Roto-Phase II

Contact ARCO

Home Office:
2325 E. Michigan Road
Shelbyville, IN 46176-3400
Toll Free: 800-428-4370
Direct: 317-398-9713
Fax: 317-398-2655
Location Manager:
E-Mail: Hal Pike
Sales Manager:
E-Mail: Tim Drake